Friday, June 10, 2011

Quick MoDOT/IDOT updates

Both IDOT and MoDOT made some announcements today, so lets get to the details quickly as computer time is very limited:
  • MoDOT started the switch to the variable advisory speeds today.
  • IDOT got more patching work coming up on the canal bridge on the eastbound lanes, since their press release link won't work correctly, all that will be mentioned is that it will happen next week during off-peak times.
If anyone hasn't noticed in recent weeks, the driving surface of the canal bridge is pretty much a piece of crap. Plan on using alternate routes to get around this mess, as IDOT is starting to adopt the MoDOT dirty bag of tricks.

Speaking of those tricks, MoDOT got the Poplar St. Bridge and some of the Highway 40 approaches all but shut down this weekend, so expect a higher than normal amount of traffic on the canal and river bridge this weekend.

Wednesday, June 8, 2011

Vacation

Unless anything important happens, there will be no updates for the next 3 weeks due to vacation and having to work potentially 7 straight nights when I return to work from vacation. I will be keeping tabs on twitter when I am out of town, however.

IDOT added another camera link from the bridge, and you can just forget using the MP1 live feed video. This one literally puts you on the bridge.

Friday, June 3, 2011

East-West Gateway gets an earful

With the temperatures heating up, it was time to turn up the heat on the East-West Gateway Long Term Transportation plans. I gave some of them a few choice words, wrote some strong comments on their comment forms, and found that IDOT pretty much skipped the meeting. (Conversely some of the MoDOT big shots were there.)

I simply wrote comments based on the previous posts on this blog. Some of the stuff mentioned included the aftermath of the December 8, 2010 incident, the left turn lane on Route 143 to the Clark Bridge that only handles 5 vehicles, the lack of shoulders on the river bridge itself, and the amount of truck traffic.

It is not too late to send your views about the long term plans to East-West Gateway. The more heat that is put on them, it can put all the heat on IDOT to do something. Until 5 PM on June 17, you can view the Virtual Open House and email comments to LRP@ewgateway.org.

Wednesday, June 1, 2011

More lane restrictions tomorrow

It been a slow month, which can be a blessing and a curse. There were those moments where the peeps had to put up with the delays with the canal bridge inspections, but finding little on the MoDOT "StLouisTraffic" twitter feed all month long (just a single stall) made May a total win.

Good things don't last long, however. IDOT is planning on lane restrictions tomorrow during off-peak hours on the river bridge for deck repairs. Its not the only dirty trick in the works, as IDOT got more contracts up for letting for June 17. This letting includes the canal bridge replacement project (packaged with the reconstruction of the Route 3 interchange for good measure), and repairs to the river bridge. (The details are on pages 19 and 29.)

Due to the severe weather last Wednesday, I was unable to unload my thoughts on the East-West Gateway long term transportation plan as intended. However, they will have to deal with yours truly tomorrow at lunch hour. This corridor needs to be fast tracked and waiting will not solve any issues.

Thursday, May 5, 2011

East-West Gateway newest long term plans - they need to be fast tracked

This week, East-West Gateway released some of their 2040 long term plans in regards to transportation. The section of 270 from the Mississippi River to Route 111 was put in the 2021-2040 range for an estimated cost of $700M. The high cost was not surprising at all. Its just surprising that IDOT wants to do anything to avoid that corridor by putting it off. They have put it off for over 20 years already (more like 25 years), and all those locals know it (the 1996-1998 and 2008 projects were nothing more than band-aids). They know that any issue happens becomes big problems almost instantly and there been way too many examples to count (some of the biggest ones already been noted in earlier posts). Everyone knows that safety is a big problem, capacity is an issue, and both the canal and river bridges is falling apart. MoDOT told the truth last month but IDOT has kept their mouth shut. IDOT has spoke very little about their canal bridge replacement project and little details were known until the Corps of Engineers posted their application earlier this year.

The good news is that there is a public hearing in regards to the 2040 Legacy plan by East-West Gateway coming up later this month. This is the best opportunity to let IDOT have some serious heat, cause they have ignored the I-270 corridor for as long as anyone can remember. IDOT needs to wake up now. MoDOT is speaking out because the locals already gave them the heat about the corridor.

Sunday, May 1, 2011

upcoming canal bridge work

Well IDOT is starting their annual inspections on the canal bridge this week, along with other repairs during off peak hours. For the people that rely on going over the Chain of Rocks on a regular basis, pray hard for rain. (Honestly, nobody wants to see any more rain, but the upcoming work is weather permitting.)

Last week, KMOX posted an article about MoDOT funding issues. Apparently, MoDOT isn't shy about what really needs to be fixed when it comes to bridges. They already conceded with the safety issues, now with replacing the whole thing? IDOT really needs to wake up and face the music.

Thursday, April 14, 2011

Some saftey bits from the North Corridor study

MoDOT posted this PDF file today in regards to safety on the I-270 mainline from 367 to the Chain of Rocks Bridge. Almost the entire section is rated poor or very poor in regards to safety. (Note: this link is only up until April 28.)

The deadline of submitting comments is April 28. (Please use I-270 North Corridor Study Comment for the subject line.)

At the very least one state has now come forward to admit safety is a big problem on the bridge. Now the waiting begins for IDOT to step up to the plate and tell the truth.

Yesterdays tractor-trailer incident happened at almost the exact same spot where the fatal incident happened on December 8. It isn't surprising that the median wall hasn't even been fixed from the first incident, and suddenly the damaged section has grown by thirty or forty feet.